Highway 114 Frontage Road Project

Expected Completion: 

  1. The service road from Davis Blvd eastbound towards Solana Blvd is estimated to be complete in the summer of 2022 according to TxDOT.
  2. The service roads between Solana Blvd and Dove Rd are expected to be complete in the winter of 2024 according to TxDOT.

Updates

Stay up to date with the latest regarding the Highway 114 frontage road project that runs through Westlake and Southlake.  Throughout the duration of this project, various road closures and detours will be implemented. Thank you in advance for your patience.

September 26, 2023 UPDATE

When: October 2, 2023 (Monday) 

Where: Westbound Entrance Ramp (Dove Rd)

What: Closure of WB SH 114 Entrance Ramp from Dove Rd

Duration: Three (3) months

September 11, 2023 UPDATE

  • EB Frontage Road and Ramp Reversals (Dove Road to Kirkwood Blvd) – In Progress
    • Complete Oct. 2023
  • Dove Road Improvements (West of SH 114)
    • Begin Nov. 2023
    • Complete Jan. 2024
  • EB Ramp Reversals (Kirkwood Blvd to Davis Blvd (FM 1938))
    • Begin Nov. 2023
    • Complete Jun. 2024

August 8, 2023 UPDATE

There will be 2 major closures impacting Highway 114 drivers in Westlake in the coming days. Please see below for more details. 

August 14

*Full closure of eastbound frontage road and eastbound Kirkwood/Solana Blvd exit ramp.

*Construction will include night-time closures during hours permitted by the construction contract (8:00pm to 5:00am).

*Duration: 1 night

August 17

*Full closure of Kirkwood/Solana Blvd at SH 114 overpass.

*Construction will include night-time closures during hours permitted by the construction contract (8:00pm to 5:00am).

*Duration: 2 nights

July 11, 2023 UPDATE

When: July 17, 2023 (Monday)

Where: Kirkwood/Solana Blvd at SH 114 Overpass

What: Full closure of Kirkwood/Solana Blvd at SH 114 Overpass

Duration: One week

Impacts:

1) Full closure of Kirkwood/Solana Blvd at SH 114 overpass.

2) Construction will include night-time closures during hours permitted by the construction contract (8:00pm to 5am)

July 5, 2023 UPDATE

There will be a full closure of Kirkwood/Solana Boulevard at the SH114 overpass nightly from 8 p.m. to 5 a.m. starting July 10. The nightly closures are expected to last a week, weather permitting. Alternate routes will be required.

June 2, 2023 UPDATE

East and westbound Highway 114 from Davis Boulevard to Dove Road will have various lanes closed from 9 p.m. to 5 a.m. Monday through Friday, June 5-9 for construction activities, weather permitting. Alternate routes are advised.

May 26, 2023 UPDATE

East and westbound Highway 114 from Davis Boulevard to Dove Road will have various lanes closed from 9 p.m. to 5 a.m. Tuesday through Friday, May 30-June 2 for construction activities, weather permitting. Alternate routes are advised.

May 22, 2023 UPDATE

Starting May 31st, the Westbound exit ramp on Highway 114 at Kirkwood/Solana Blvd will be closed for the next four months. The Westlake detour calls for you to get off on the Davis Blvd exit and circle back onto Solana Blvd. Please be careful when driving through the area.  

April 20, 2023 UPDATE

Eastbound Highway 114 from Davis Boulevard to Dove Road will have various lanes closed from 9 p.m. to 6 a.m. Monday through Friday, April 24-28 for construction activities, weather permitting. Alternate routes are advised. 

January 6, 2023 UPDATE

East and westbound Highway 114 from Kirkwood Boulevard to Westlake Parkway will be reduced to one lane from 9 p.m. to 6 a.m. Monday through Friday, Jan. 9-13 for construction activities, weather permitting.  Alternate routes are advised. 

December 3, 2022 UPDATE

East and westbound Highway 114 from Kirkwood Boulevard to Westlake Parkway will have various lanes closed from 9 p.m. to 6 a.m. Monday through Friday, Dec. 5-9 for construction activities, weather permitting.  Alternate routes are advised.

November 28, 2022 UPDATE

East and westbound Highway 114 from Kirkwood Boulevard to Westlake Parkway will have various lanes closed from 9 p.m. to 6 a.m. Monday through Friday, Nov. 28-Dec. 2 for construction activities, weather permitting.  Alternate routes are advised.

October 21, 2022 UPDATE

East and westbound Highway 114 from Kirkwood Boulevard to Westlake Parkway will have various lanes closed from 9 p.m. to 6 a.m. Wednesday through Friday, Oct. 26-28 for construction activities, weather permitting.  Alternate routes are advised.

October 4, 2022 UPDATE

East and westbound Highway 114 at Trophy Club Drive will be closed from 8 p.m. to 6 a.m. Thursday and Friday, Oct. 6-7 for bridge construction activities, weather permitting. Motorists will be directed through a signed detour. Alternate routes are advised.

September 28, 2002 UPDATE

Eastbound Highway 114 and eastbound Highway 170 will be closed from 8 p.m. to 6 a.m. Tuesday, Oct. 4 for construction activities, weather permitting. Westbound SH 114 at SH 170 will be closed from 8 p.m. to 6 a.m. Wednesday, Oct. 5. Motorists will be directed through signed detours. Alternate routes are advised.

August 2, 2022 UPDATE

Westbound Highway 114 at SH 170 will have various lanes closed from 8 p.m. to 6 a.m. Tuesday through Wednesday, Aug. 2-3 for construction activities, weather permitting. The westbound SH 114 exit to SH 170 will also be closed. Alternate routes are advised.

July 15, 2022 UPDATE

Eastbound Highway 114 from Kirkwood Boulevard to Davis Boulevard will have various lanes closed from 9 a.m. to 3 p.m. Monday through Saturday, July 18-23 for construction activities, weather permitting.  Alternate routes are advised.

July 1, 2022 UPDATE 

Eastbound Highway 114 from Kirkwood Boulevard to Davis Boulevard will have various lanes closed from 9 a.m. to 3 p.m. Wednesday through Saturday, July 6-9 for construction activities, weather permitting. Closures will also be scheduled from 9 p.m. to 6 a.m. Wednesday through Friday, July 6-8. Alternate routes are advised.

June 23, 20222 UPDATE

Eastbound Highway 114 from Kirkwood Boulevard to Davis Boulevard will be reduced to one lane from 9 p.m. to 6 a.m. Monday through Tuesday, June 27-28 for construction activities, weather permitting. The eastbound SH 114 entrance ramp from Solana Boulevard will also be closed through the fall.  Alternate routes are advised.

June 10, 2022 UPDATE

Eastbound Highway 114 from Kirkwood Boulevard to Davis Boulevard will be reduced to one lane from 9 p.m. to 6 a.m. Monday through Friday, June 13-17 for construction activities, weather permitting. Alternate routes are advised.

June 3, 2022 UPDATE

Eastbound Highway 114 from Kirkwood Boulevard to Davis Boulevard will be reduced to one lane from 9 p.m. to 6 a.m. Monday through Friday, June 6-10 for construction activities, weather permitting. Alternate routes are advised.

May 29, 2022 UPDATE

Eastbound Highway 114 from Kirkwood Boulevard to Davis Boulevard will be reduced to one lane from 9 p.m. to 6 a.m. Tuesday through Friday, May 31-June 3 for construction activities, weather permitting. Alternate routes are advised.

May 19, 2022 UPDATE

Eastbound Highway 114 from Kirkwood Boulevard to Davis Boulevard will be reduced to one lane from 9 p.m. to 6 a.m. Monday and Tuesday, May 23-24 for construction activities, weather permitting. Alternate routes are advised.

May 12, 2022 UPDATE

Eastbound Highway 114 from Kirkwood Boulevard to Davis Boulevard will be reduced to one lane from 9 p.m. to 6 a.m. Monday, May 16 for construction activities, weather permitting. Alternate routes are advised.

May 10, 2022 UPDATE

Eastbound Highway 114 from Kirkwood Boulevard to Davis Boulevard will be reduced to one lane from 9 p.m. to 6 a.m. Thursday, May 12 for construction activities, weather permitting. Alternate routes are advised.

March 10, 2022 UPDATE

East and westbound Highway 114 from Kirkwood Boulevard to Dove Road will have various lanes closed from 9 a.m. to 3 p.m. Monday through Saturday, March 14-19 for construction activities, weather permitting. Alternate routes are advised.

March 18, 2022 UPDATE

East and westbound Highway 114 from Trophy Club Drive to Parish Lane will have various lanes closed from 9 a.m. to 3 p.m. Monday through Saturday, March 21-26 for construction activities, weather permitting. Alternate routes are advised.

March 7, 2022 UPDATE

Eastbound Highway 114 at Dove Road will have various lanes closed from 9 a.m. to 3 p.m. Tuesday, March 8 for construction activities, weather permitting. Alternate routes are advised.

March 3, 2022 UPDATE

Eastbound Highway 114 at Dove Road will have various lanes closed from 9 a.m. to 3 p.m. Friday, March 4 for construction activities, weather permitting. Alternate routes are advised.

February 25, 2022 UPDATE

East and westbound Highway 114 from Kirkwood Boulevard to Dove Road will have various lanes closed from 9 p.m. to 6 a.m. Monday, Feb. 28 for construction activities, weather permitting. Alternate routes are advised.

February 18, 2022 UPDATE

East and westbound Highway 114 from Kirkwood Boulevard to Dove Road will have various lanes closed from 9 p.m. to 6 a.m. Monday through Friday, Feb. 21-25 for construction activities, weather permitting. Alternate routes are advised.

February 14, 2022 UPDATE

Eastbound Highway 114 at SH 170 will be closed from 8 p.m. to 6 a.m. Thursday and Friday, Feb. 17-18 for construction activities. Motorists will be directed through a marked detour.  Westbound Highway 114 will be reduced to one lane at Highway 170 from 8 p.m. to 6 a.m. Thursday and Friday, Feb. 17-18, weather permitting. Alternate routes are advised.

February 11, 2022 UPDATE

East and westbound Highway 114 from Kirkwood Boulevard to Dove Road will have various lanes closed from 9 a.m. to 3 p.m. Monday through Saturday, Feb. 14-19 for construction activities, weather permitting. Alternate routes are advised.

January 14, 2022 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will be reduced to one lane from 9 p.m. to 6 a.m. Sunday, Jan. 16 for construction. The eastbound Kirkwood Boulevard exit will be closed through the spring of 2022.  Motorists will be directed through a marked detour. Alternate routes are advised.

January 2, 2022 UPDATE

Westbound Highway 114 from Dove Road to Kirkwood Boulevard will be reduced to one lane from 9 p.m. to 6 a.m. Sunday evening, Jan. 2 for construction. Various ramps will also be closed. Alternate routes are advised.

November 18, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Dove Road will be reduced to one lane from 9 p.m. to 6 a.m. Monday evening, Nov. 22, weather permitting. Various ramps will also be closed at various times. Alternate routes are advised.

October 15, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will be reduced to one lane from 9 p.m. to 6 a.m. Monday through Thursday nights, Oct. 18-21. The eastbound SH 114 entrance ramp from Davis Boulevard will also be closed through early 2022. Alternate routes are advised.

October 4, 2021 UPDATE

Starting Friday, October 15th, there will be a major change to one of the entrance ramps onto Highway 114. There will be a closure of the eastbound entrance ramp east of Davis Blvd (FM 1938) along 114. This is due to the construction of concrete pavement for ramps and frontage road between Davis Blvd (FM 1938) and Solana/Kirkwood Blvd along eastbound 114. This is expected to be a 3-6 month project. Please see the map above for more information about the detours that will be put into place for the next several months. 

October 1, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will have the far-right lane closed daily from 9 a.m. to 3 p.m. Monday through Saturday, Oct. 4-9. Various ramps will also be closed at various times. Alternate routes are advised.

September 9, 2021 UPDATE

Westbound Highway 114 from Kirkwood Boulevard to Davis Boulevard will have the far-right lane closed daily from 9 a.m. to 3 p.m. Monday through Saturday, Sept. 13-18. Various ramps will also be closed at various times. Alternate routes are advised.

September 2, 2021 UPDATE

Westbound Highway 114 from Kirkwood Boulevard to Davis Boulevard will have the far-right lane closed daily from 9 a.m. to 3 p.m. Tuesday through Saturday, Sept. 7-11. Various ramps will also be closed at various times. Alternate routes are advised.

August 26, 2021 UPDATE

Westbound Highway 114 from Kirkwood Boulevard to Davis Boulevard will have the far-right lane closed daily from 9 a.m. to 3 p.m. Monday through Thursday, Aug. 30-Sept. 2. Various ramps will also be closed at various times. Alternate routes are advised.

August 20, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will be reduced to one lane 8 p.m. to 6 a.m. Monday through Friday nights, Aug. 23-27 for construction, weather permitting. Various ramps will also be closed at various times. Alternate routes are advised.

August 17, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will be reduced to one lane 8 p.m. to 6 a.m. Wednesday through Friday nights, Aug. 18-20 for construction, weather permitting. Various ramps will also be closed at various times. Alternate routes are advised.

August 13, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will be reduced to one lane 8 p.m. to 6 a.m. Sunday through Wednesday nights, Aug. 15-18 for construction, weather permitting. Various ramps will also be closed at various times. Alternate routes are advised.

August 5, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will be reduced to one lane 8 p.m. to 6 a.m. Tuesday through Friday nights, Aug. 10-13 for construction, weather permitting. Various ramps will also be closed at various times. Alternate routes are advised.

July 22, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will have the far-right lane closed daily from 9 a.m. to 3 p.m. Monday through Saturday, July 26-31 for construction. Various ramps will also be closed at various times. Alternate routes are advised.

July 16, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will have the far-right lane closed daily from 9 a.m. to 3 p.m. Monday through Saturday, July 19-24 for construction. Various ramps will also be closed at various times. Alternate routes are advised.

July 1, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will have the far-right lane closed daily from 9 a.m. to 3 p.m. Tuesday through Saturday, July 6-10 for construction. Various ramps will also be closed at various times. Alternate routes are advised.

June 17, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will have the far-right lane closed daily from 9 a.m. to 3 p.m. Monday through Saturday, June 21-26 for construction. Various ramps will also be closed at various times. Alternate routes are advised.

June 10, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will have the far-right lane closed daily from 9 a.m. to 3 p.m. Monday through Saturday, June 14-19 for construction. Various ramps will also be closed at various times. Alternate routes are advised.

May 27, 2021 UPDATE

Westbound Highway 114 from Kimball Avenue to N. Carroll Avenue will have various lanes closed nightly from 8 p.m. to 6 a.m. Tuesday through Thursday, June 1-3 for maintenance activities, weather permitting. Various ramps will also be closed. Alternate routes are advised.

May 21, 2021 UPDATE

East and westbound SH 170 will have various single-lane closures from I-35W to US 377 from 9 a.m. to 3 p.m. May 24-27 for construction activities. Various crossovers and ramps will also be closed for construction. Alternate routes are advised.

May 14, 2021 UPDATE

Westbound Highway 114 from Kimball Avenue to N. Carroll Avenue will have various lanes closed nightly from 8 p.m. to 6 a.m. Sunday through Thursday, May 16-20 for maintenance activities, weather permitting. Various ramps will also be closed. Alternate routes are advised.

May 10, 2021 UPDATE

Westbound Highway 114 from Kimball Avenue to N. Carroll Avenue will have various lanes closed 8 p.m. to 6 a.m. May 10-13 for maintenance activities, weather permitting. Various ramps will also be closed. Alternate routes are advised.

May 7, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will have the far-right lane closed daily from 9 a.m. to 3 p.m. May 10-15 for construction. Various ramps will also be closed at various times. Alternate routes are advised.

April 29, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will have the far-right lane closed daily from 9 a.m. to 3 p.m. May 3-8 for construction. Various ramps will also be closed at various times. Alternate routes are advised.

April 19, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will have the far-right lane closed daily from 9 a.m. to 3 p.m. April 19-24 for construction. Various ramps will also be closed at various times. Alternate routes are advised.

April 12, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will have the far-right lane closed daily from 9 a.m. to 3 p.m. April 12-17 for construction. Various ramps will also be closed at various times. Alternate routes are advised.

April 5, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will have the far-right lane closed daily from 9 a.m. to 3 p.m. April 5-10 for construction. Various ramps will also be closed at various times. Alternate routes are advised.

March 29, 2021 UPDATE

Eastbound Highway 114 from Davis Boulevard to Kirkwood Boulevard will have the far-right lane closed daily from 9 a.m. to 3 p.m. March 29-April 3 for construction. Various ramps will also be closed at various times.

March 22, 2021 UPDATE

Eastbound SH 114 from Davis Boulevard to Kirkwood Boulevard will have the far-right lane closed daily March 22-27 from 9 a.m. to 3 p.m. for construction. Various ramps will also be closed at various times. Alternate routes are advised.


March 15, 2021 UPDATE

Eastbound SH 114 from Davis Boulevard to Kirkwood Boulevard will have the far-right lane closed daily March 15-20 from 9 a.m. to 3 p.m. for construction.  Various ramps will also be closed at various times. Alternate routes are advised.

February 3, 2021 UPDATE

114

When:        Feb. 6, 2021 (Saturday)

Where:       SH 114 eastbound entrance ramp at FM 1938 (Davis Blvd)

SH 114 eastbound main lanes (FM 1938 (Davis Blvd) to Kirkwood/Solana Blvd)

SH 114 eastbound exit ramp at Kirkwood/Solana Blvd

What:         Construction zone setup, barrier installation

Duration:  One (1) day – Barrier placement

Impact(s):

1.   Closure of SH 114 eastbound FM 1938 (Davis Blvd) entrance ramp (east of FM 1938 (Davis Blvd)) – Detour to be provided

2.   Closure of right lane (one (1) lane) of SH 114 eastbound main lanes from FM 1938 (Davis Blvd) to Kirkwood/Solana Blvd

3.   Closure of SH 114 eastbound Kirkwood/Solana Blvd exit ramp (west of Kirkwood/Solana Blvd) 


When:        Feb. 8, 2021 (Monday) – Feb. 12, 2021 (Friday)

                     Feb. 15, 2021 (Monday) – Feb. 19, 2021 (Friday)

Where:       SH 114 eastbound main lanes (FM 1938 (Davis Blvd) to Kirkwood/Solana Blvd)

What:         Retaining wall construction activities

Duration:  Two (2) weeks – Daytime closure (9:00am – 3:00pm)

Impact(s):

1.   Closure of right lane (one (1) lane) of SH 114 eastbound main lanes from FM 1938 (Davis Blvd) to Kirkwood/Solana Blvd

 


 

January 28, 2021 UPDATE

roads2

When: Jan. 29, 2021 (Friday)

Where: Eastbound Dove Rd exit ramp

What:  Update pavement markings along Dove Rd exit ramp

Duration: One (1) day - daytime closure (9:00am to 3:00pm)

Impact(s):

1.         Closure of right lane (one (1) lane) of SH 114 eastbound main lanes from FM 1938 (Davis Blvd) to Dove Rd

2.         Closure of SH 114 eastbound Dove Rd exit ramp (west of Dove Rd)

 -----------------------------

When: Jan. 30, 2021 (Saturday)

Where: Dove Rd north of SH 114

What:  Construction zone setup, barrier installation

Duration: One (1) day – Barrier placement

            Ongoing – Construction zone

Impact(s):

1.         Closure of right lane (one (1) lane) of SH 114 westbound frontage road east of Dove Road

2.         Closure of right lane (one (1) lane) of Dove Road north of SH 114 frontage road 

------------------------------


When:        Feb. 6, 2021 (Saturday)

Where:       SH 114 eastbound entrance ramp at FM 1938 (Davis Blvd)

SH 114 eastbound main lanes (FM 1938 (Davis Blvd) to Kirkwood/Solana Blvd)

What:         Construction zone setup, barrier installation

Duration:  One (1) day – Barrier placement

Impact(s):

1.   Closure of SH 114 eastbound FM 1938 (Davis Blvd) entrance ramp (east of FM 1938 (Davis Blvd))

2.   Closure of right lane (one (1) lane) of SH 114 eastbound main lanes from FM 1938 (Davis Blvd) to Kirkwood/Solana Blvd


January 12, 2021 UPDATE

114 updates

This will be a three-year TxDOT project including the following improvements to the highway frontage roads and ramp facilities from Westlake Parkway to Dove Road in Southlake.

Frontage Road Improvements (Green):

  • Eastbound frontage road – FM 1938 (Davis Blvd) to Kirkwood/Solana Blvd
  • Eastbound frontage road – Kirkwood/Solana Blvd to Dove Road
  • Westbound frontage road – Dove Road to Kirkwood/Solana Blvd

These improvements include extensions to the eastbound lanes of the frontage road from FM 1938 (Davis Blvd) to Dove Rd and the westbound lanes from Dove Rd to Kirkwood/Solana Blvd.

Impact: The U-Turn on the eastside of the FM 1938 (Davis Blvd) will be closed starting January 8. 

Barriers will be installed within the shoulder section along the mainlines of eastbound SH114 west of the FM 1938 (Davis Blvd) overpass beginning January 8th 

Ramp Improvements (orange):

  • Eastbound entrance ramps – Three (3) total
  • Eastbound exit ramps – Two (2) total
  • Westbound entrance ramps – Two (2) total
  • Westbound exit ramps – Two (2) total

These improvements include the realignment of the current ramps between FM 1938 (Davis Blvd) and Kirkwood/Solana Blvd.

Impact: Various ramps throughout the project limits will be closed at different times throughout the project. The first closure will occur with the entrance ramp west of FM 1938 (Davis Blvd)on January 8th.   

U-Turn Improvements(Blue):

  • Eastbound to westbound at Kirkwood/Solana Blvd
  • Westbound to eastbound at Kirkwood/Solana Blvd
  • Eastbound to westbound at Dove Road

These improvements include adding U-Turn under SH 114 and Kirkwood/Solana Blvd and Dove Road.

Impact: Various lane closures near the improvements will be closed at different times. The first U-turn improvements are anticipated to begin in the Spring of 2021.